$40M to Modernize Medical Sciences Building

Jul 28, 2016
Author: 
Linda Quattrin
The Medical Sciences Building

“Not a moment too soon.”

That’s the reaction from Professor Trevor Young, Dean of the Faculty of Medicine, to news announced today that a comprehensive $40M renovation – part of the $190M campus-wide Lab Innovation for Toronto (LIFT) project – will bring facilities in the Medical Sciences Building (MSB) into the 21st century.

“The state of our infrastructure at MSB belies our position as one of the Top 12 medical schools in the world,” said Young, noting that more than 270 researchers across eight departments will benefit from laboratory renovations to be completed over the next two years. “U of T Medicine is highly productive in fundamental research. This investment is critical for us to offer students high quality training opportunities and to drive the research advances that keep us competitive on a global stage.”

Built in 1969, the Medical Sciences Building (MSB) on King's College Circle is a notable example of Brutalist architecture with its linear concrete façade, sprawling floorplates and a warren of laboratory and teaching spaces to accommodate the scientific and academic needs of the time.

Nearly 50 years later, those facilities can no longer support the kind of high level, multidisciplinary research for which U of T is renowned. MSB laboratories are limited by their cloistered design, which prevents cross-pollination of ideas and interferes with ongoing scientific collaboration. While still functional, many labs are worn and outdated and lack sufficient ventilation and emergency power for today’s core infrastructure such as ultra-low temperature freezers.

In addition to upgrading critical infrastructure related to power, cold rooms, lab benches, flooring etc., this investment will modernize the Faculty’s anatomy teaching labs, which will improve the learning experience for approximately 2,500 students from a range of disciplines each year.

As well, a key piece of research equipment – a 1GHz Nuclear Magnetic Resonance (NMR) machine, only the second in the world – will be able to be installed thanks to structural slab reinforcements and other improvements to house the heavy machine. NMR is a powerful imaging technique for scientists to investigate the biochemical complexities of the cell at the molecular level. This detailed research contributes to our understanding of how healthy and unhealthy cells function in our bodies; knowledge that can open targeted new avenues for disease diagnosis, treatment and prevention.

 Renovations are under way and will be completed by mid-2018.

Feb 28 – Mar 29
Leading Transformation: Building Adaptive Capacity - Advanced Learning Program at IHPME
Course | 8:30am–5:00pm
Mar 25 RSI Speaker Series: Women and Brain Health
Other | 11:00am–12:00pm
Mar 26 Implementing Innovations
Workshop/Seminar | 5:00pm–7:00pm
Mar 27 1st Annual REC-Amend Symposium: Accessible BIPOC Mental Health Services
Symposium | 5:30pm–8:30pm
Apr 3 WebPac Training
Workshop/Seminar | 2:00pm–3:30pm
Apr
4 – 6
59th Annual Program for Practising Surgeons Update in General Surgery
Conference | 7:00am–5:30pm
Apr 4 19th Toronto Breast Surgery Symposium
Symposium | 7:15am–5:00pm

Tweets

UofT Medicine
@uoftmedicine
Robots in the OR: medical experts weigh in on robot-assisted surgery and what it means for healthcare https://t.co/E65B96Ypoq
UofT Medicine
@uoftmedicine
Got an idea for a start-up? Entrepreneurs & their early-stage startups at will soon have access to a new fina… https://t.co/ormVuM2rMI
UofT Medicine
@uoftmedicine
“It’s a very exciting time in science, with new developments expanding the realm of what we thought possible… we ar… https://t.co/3fGwcdGTmA

UofTMed Magazine

Have we lost the art of dying?

Sign up for your free digital copy.
Back to Top